Gas-Sealed Well Control Equipment Solutions
For the needs of drilling and developing natural
gas in high-pressure gas fields, well control
equipment needs to be able to achieve gas sealing.
Our company can provide supporting solutions for
well control equipment such as high-pressure
gas-sealed blowout preventer groups and manifolds
Well control equipment solutions for extremely
With the increasing demand for drilling and
development in low-temperature regions, the
low-temperature capabilities of well control
equipment such as blowout preventer groups,
manifolds, and control systems have been challenged.
Our company provides low-temperature well
control equipment solutions for the operational
needs in extremely cold and low-temperature regions.
High-capacity shear well control
On-site well control operations place higher
demands on the shear capacity of the BOP, as well
as the safety factor of the control system equipment
and the accumulator volume. The BOP needs to
be able to shear high-performance, thick-walled
drill pipes and casings, and the accumulator
volume of the BOP control system matched with
the BOP group with shear gates has almost doubled.
In view of the above working conditions, our company
provides customers with high-capacity shear gate
blowout preventers, shear-specific remote control
and other high-capacity shear well control
Hydraulic locking solution for gate blowout preventer
The locking mechanism of the gate blowout preventer is
an important mechanism to ensure the reliable closing
of the gate and the safety of well sealing. It is divided
into two forms: manual locking mechanism and hydraulic
automatic locking mechanism. The hydraulic automatic
locking mechanism can automatically realize the locking
and unlocking functions of the gate, without manual
operation, low labor intensity and high efficiency. It
is suitable for occasions with high requirements for
the automation of the blowout preventer and limited